View Single Post
  #13 (permalink)  
Old 06-10-09, 04:27
Amelia Amelia is offline
Moderator
 
Join Date: Mar 2009
Posts: 496
Default

Quote:
Originally Posted by Dave M View Post
The way I understand how these things work, any downtime due to an upgrade will be because of switching servers (though that can be mitigated in a clustered environment). Upgrading the control panel license, though, should not result in any downtime as you're not changing servers or nodes, just changing the control panel license. So, no, there should be no downtime when upgrading the Plesk license.
That's right, in that case only the Plesk License is upgraded. There are no server moves required.
Reply With Quote